IST Outage Reported NJIT Wired Networks

Power outage impacting Venturelink Building, CHEN, STPG and FSB.

The was a power issue starting at 6:45am lasting until 7:45am when the power failed in a key location. The system ran battery backup until 7:55am, At this point the power shut down. Power was restored at 8:10am and all network services were restored by 8:20am.

Ref:MSG0870218_RSGAhWV0AiLaVQABpAYb

Leave a comment